Residential & Commercial
EV Charger Installation in Southeast Wisconsin
We install Level 2 EV chargers for homes and businesses, including dedicated circuits, load calculations, and panel upgrades when needed.
What's Involved
EV Charger Installation
A Level 2 charger uses a 240-volt circuit. We check the capacity of your panel and service, install a circuit sized for the charger, and connect it using the hardwired or outlet setup required for your equipment.
If the installation needs panel or service work, we include that in the estimate. We also install charging equipment for multi-unit properties and workplaces.
What We Handle
Common ev charger installation jobs
- Level 2 home chargersHardwired units or NEMA 14-50 outlets, garage or outdoor.
- Dedicated 240V circuitsSized to the charger and run cleanly to the panel.
- Load calculationsChecking your service capacity for the charger.
- Panel upgrades when neededIncluded in the installation estimate when required.
- Commercial & workplace chargingMultiple units, parking areas, and shop installs.
Questions
EV Charger Installation FAQ
Do I need to upgrade my panel for an EV charger?
Sometimes. We calculate the added load and check the panel's capacity and available space. If an upgrade is needed, we include it in the estimate.
Hardwired or plug-in outlet?
Both work. A NEMA 14-50 outlet gives you flexibility to unplug and take the charger with you; hardwiring is cleaner for a permanent install and required for some higher-output units. We'll match it to your charger and your garage.
Do EV charger installs need a permit?
Yes, a dedicated 240V circuit is permitted work. We handle the permit and inspection.
Request an estimate
Serving Dodge County, Washington County & Fond du Lac County.
Related

